Blog posts tagged in Aircraft Maintenance Program

Posted by on in Regulatory

Sofema Online (SOL) www.sofemaonline.com considers the key elements of the Aircraft Maintenance Program (AMP) Task Optimization.

Introduction

Aircraft maintenance program task optimization is a critical goal for airlines and other aviation organizations.

Last modified on

Sofema Online (SOL) www.sofemaonline.com considers the Regulator Oversight of Aircraft Maintenance Programs (AMP)

Introduction

The Agency is, on behalf of the Member States, the competent authority for initial airworthiness as per Article 77(1) of Regulation (EU) 2018/1139 (the EASA ‘Basic Regulation’). Following M.A.302(d)(2), ICA shall be the basis to develop an AMP. 

Whilst the Member State’s CA is responsible for approving the AMP, they should not normally impose such as national requirements, in addition to the instructions for continuing airworthiness (ICA) issued by the design approval holder during the certification process with the Agency.

Last modified on

Presented by Sofema Aviation Services (www.sassofia.com)

Continuing Airworthiness Tasks 

The aircraft continuing airworthiness and the serviceability of operational and emergency equipment shall be ensured by:

(a) The accomplishment of pre-flight inspections.

(b) The rectification of any defect and damage affecting safe operation in accordance with data specified in points ML.A.304 and ML.A.401, as applicable, while taking into account the minimum equipment list (‘MEL’) and configuration deviation list, when they exist.

(c) The accomplishment of all maintenance in accordance with the AMP referred to in point ML.A.302.

Last modified on