Blog posts tagged in Receiving

Certain Parts will require special attention due to the size for example Aircraft Landing Gears and Engines. To ensure adequate inspection techniques are followed the following should be included.

a) Written procedures?

b) Internal quality audit procedures?

c) Signature procedures?

d) Procedures for checking for physical damage and defects?

e) Preservation procedures?

f) Procedures for quantities received controls?

g) Verification procedures for part/model/serial numbers?

h) Documentation matches part(s)/material(s) received?

Last modified on