SofemaOnline (SOL) www.sofemaonline.com takes a look at the activities of the Structural Task Group (STG)
Introduction
The TCH should update periodically a list of SB which were already selected for a review with all decisions made, and add to this list all new and revised SB. Moreover, some specific modification SB not linked to an inspection SB may also be selected for review.
Operators information input should be collected and analyzed by the TCH for the STG meeting.